The Razor Method
A better way toset up projects.
The Razor Method sets a project up before design starts, so estimates rest on reviewed, approved information and problems surface early.
Why it works
Tools come and go.
The way teams structure information, make decisions and communicate is what lasts. The Razor Method is built around that, so it works alongside the tools your teams already use.
Two layers at a glance
OPS builds the machine. SHARP runs the job.
Razor OPS
Razor OPS is the operations layer behind every project: the people, policies, augmented human intelligence, workflow and tools that support it.
Razor SHARP
Razor SHARP is the project layer, in five parts: Start With Clarity, Hone The Checks, Assign Real Owners, Run One Workflow, Prime The System.
SHARP does not need to wait for OPS to be perfect. It can start on your next project while OPS is built up alongside it.
How it evolved
- 1995 to 2001Foundations
- 2001 to 2016Design Team Development
- 2016 to 2022Owner, Contractor and Design Development
- 2022 to todayMulti-Disciplinary AI, Razor OPS and Design
United Kingdom, Bermuda, Canada, the Cayman Islands, and Canada again.
Worked example
Kapok Residential Tower
Cayman Islands
On Kapok, we put model-based coordination first: 2D exterior envelope details fell by more than 70%, site layout stayed within 1/16 inch, and there was no major redesign during construction.
I ran construction administration on Kapok personally, reviewed shop drawings and confirmed it was built as designed in almost every detail.
Rick Aspin
"The three-dimensional details were of great benefit coordinating work on site, particularly the ability to pull accurate quantities directly from the model."
Razor SHARP sets projects up. It does not rescue projects already too far gone.
What happens next
The Health Check shows where your projects stand.
Putting the method in place is work we do together.