Rick Aspin · Founder · Track Record

Decades guiding buildings from design through construction

Four countries, collaborating across design, engineering and owner sides of the table, with the Razor Method growing through all of it. Select any country, firm, project or phase to explore.

Rick Aspin · Founder · Track Record

Decades guiding buildings from design to operation

Razor Method Design and engineering roles Owner / contractor-side design management Own practice Firm Method milestone Public speaking Method phase Start and finish Project with images Project with a testimonial

Explore by country

Drawn to scale. Firms sit at their start date. Undated projects are spaced evenly within their firm's time.

Full history
  1. 2022 to todayCanada

    Vellum & Razor Blades

    Founder · Powell River, British Columbia

    Founded to bring the Razor Method to owners and their teams. V&RB has grown alongside my concurrent project roles.

    • Townsite Jazz Festival. Powell River. Operations and Digital Solutions Lead, a volunteer role, and a board member since November 2025.
    • Real estate brokerage, Cayman. Sales and marketing support for a real estate brokerage, including AI-assisted research, content and brand development, and advertising campaign management, all adding value to client deliverables.
    • Residential developer, Cayman. Advertising campaigns for a luxury residential development, built from existing interview footage, with AI-assisted management and reporting adding value to client deliverables.
    • Razor SHARP. The project layer of the Razor Method, in five parts: Start With Clarity, Hone The Checks, Assign Real Owners, Run One Workflow, Prime The System.
    • Razor OPS. The firm’s operations layer of the Razor Method. Razor OPS (Operationally Primed for Success) builds the machine: the people, policies, intelligence, workflow and tools that support every project.
  2. August 2023 to April 2025Canada

    KRA

    Joined as Director of Technical Design and Innovation · Vancouver, British Columbia

    Architecture practice.

    • Prince Albert Victoria Hospital. Saskatchewan. An $898M redevelopment for the Saskatchewan Health Authority. I led quality assurance and technical design.
  3. 2016 to 2022Cayman Islands

    Dart Enterprises

    Senior BIM/VDC Manager and Design Manager, owner’s side · Grand Cayman, Cayman Islands

    Built the BIM/VDC department from a blank canvas and managed the design process, inside a contractor-led design team where builder and designers worked as one. The Razor Method was tested and evolved across five major projects.

    • Camana Bay Block 5 South. Office and commercial. My first project review at Dart, with the building close to completion.
    • Camana Bay Block 10 North. Camana Bay.
    • Camana Bay Block 7B Office Tower. Camana Bay.
    • Camana Bay Block 7D Office Building. Camana Bay.
    • West Bay Road Underpass. Underpass at Camana Bay.
    • Cayman International School. New high school and elementary school.
    • Foster’s Food Fair. Grocery store.
    • 60 Nexus Way. Office building. I led the RFP and setup phases, then handed delivery to the internal team.
    • Kapok Residential Tower. I was lead architectural designer as well as managing the project team, and completed construction administration through to occupancy.
    • Hotel Indigo. I led the RFP and setup phases, then handed delivery to the internal team.
  4. November 2018Public speaking

    Autodesk University 2018

    Instructional demo: “Using BIM 360 Tools to Coordinate Delivery of a Data-Rich Virtually Constructed Model”.

  5. October 2010 to 2016Canada

    Cotter Architects / ZGF Cotter

    BIM Implementation Coordinator and Production Manager · Vancouver, British Columbia

    Joined Cotter Architects and stayed through its 2014 partnership with ZGF. I created the BIM-based delivery systems and procedures I still build on, and trained the teams to use them.

    • 3 Civic Plaza. Surrey. Mixed-use tower with commercial, hotel, office and residential uses. SkyTrain runs through the site and over part of the building, which needed close coordination.
    • The Heights at Mount View. Saanich. Seven-storey, 260-suite long-term care residence for Baptist Housing.
  6. January 2008 to October 2010Canada

    Cambia Design Inc.

    President · Vancouver, British Columbia

    My own practice. BIM and production management services for architectural practices in Greater Vancouver, plus design services for residential clients.

    The practice began with a focus on efficient small-space planning, including custom furniture designed for flexibility. It later took on the Passive House approach.

    I also worked remotely as a structural technologist for firms in Bermuda.

    • Reid Road Duplex. Squamish. A sustainable duplex designed to a partial Passive House standard, with architectural and structural documentation coordinated in three dimensions in Revit.
    • Structural work for Bermuda firms. Structural technologist work for firms in Bermuda, delivered remotely from Vancouver.
    • Small space design. Efficient space planning for small homes, including custom furniture designed for flexibility.
  7. November 2006 to January 2008Canada

    DYS Architecture

    Job Captain / BIM Manager · Vancouver, British Columbia

    Mid-sized Vancouver architecture practice, founded in 1982. Known for affordable housing, health care, Passive House design and complex mixed-use projects.

    I joined as Job Captain/BIM Manager for Vancouver’s Turn, where DYS worked alongside Arthur Erickson.

    • Vancouver’s Turn. Arthur Erickson’s final signature tower, designed to house a Ritz-Carlton hotel and residences.
  8. July 2004 to October 2006Bermuda

    Botelho Wood Architects

    Senior Architectural Technologist · Smith’s Parish, Bermuda

    Set up by Ted Wood and Germano Botelho. Belmont Hills moved with Ted from Entasis. I also helped develop the practice’s data management and CAD standards.

    • Belmont Hills Golf Resort. Started at Entasis under Ted Wood, then moved to Botelho Wood when Ted and Germano Botelho set up the new firm.
  9. November 2001 to July 2004Bermuda

    Entasis Architecture

    Architectural Technologist · City of Hamilton, Bermuda

    Residential additions and renovations, a bed and breakfast conversion, a steel-framed auto-body shop and several swimming pools.

    • Private hillside residence, Costa Rica. Design of a private home for a hillside site in Costa Rica, two storeys under hipped roofs with a pergola and a separate garage.
    • Well Bottom Autobody Shop. A steel-framed auto body shop with a mezzanine, built around a spray paint booth. I was the architectural technologist under the practice lead.
    • Private residence and pool terrace, Smiths. Renovation and extension of a private home in Smiths, Bermuda, with a new swimming pool and hot tub, terraces, a barbecue and a spit roast.
    • Horizons & Cottages pool deck. Renovation of the hotel pool deck at Horizons & Cottages, Paget, Bermuda.
    • Coral Beach Club dance floor. Dance floor for the Coral Beach Club.
  10. February to November 2001United Kingdom

    BDP

    Senior Architectural Technologist · Manchester, Greater Manchester

    Multi-functional design team based on site at Manchester Piccadilly Station.

    • Manchester Piccadilly Station. A £45M redevelopment delivered for the 2002 Commonwealth Games.
  11. November 1999 to February 2001United Kingdom

    Cassidy & Ashton

    Architecture · Preston, Lancashire

    Architects, building surveyors and planners. Much of my work was for British Aerospace.

    • BAe Warton Fitness Centre. New fitness centre for British Aerospace staff at Warton. Design through to as-built issue.
    • Marsden House. Bolton, for Mowlem Northern.
  12. June 1998 to November 1999United Kingdom

    Allott & Lomax

    Architecture department · Sale, Greater Manchester

    Multi-disciplinary consulting engineers. I coordinated drawing packages and led the CAD standards so the multi-disciplinary teams could collaborate and share information effectively.

    • Willington Power Station. Power station. I coordinated the technical team and the drawing package.
    • Enfield Energy Centre. Power station for ABB Power Generation. Architectural conceptual design elevations.
    • B41 Waste Retrieval Plant. Waste retrieval building. Door schedule and wall construction information.
  13. October 1997United Kingdom

    Simon Carves

    Structural · Workington, Cumbria

    Civil and structural practice.

    • Sellafield charge machines. For BNFL. Scheme drawings for sealed partitions around the production charge machines, to allow decommissioning.
  14. ContractUnited Kingdom

    Liverpool City Council

    Liverpool, Merseyside

    Schools and fire stations: surveys of existing buildings, plans and renovation design.

  15. ContractUnited Kingdom

    Philips Electronics

    Stockport, Greater Manchester

    Clean room design for electronics production.

  16. 1996United Kingdom

    Derek Lovejoy Partnership

    Landscape Architecture · Manchester, Greater Manchester

    Landscape architecture practice.

    • The Earth Centre. Masterplan, Derek Lovejoy Partnership with Battle McCarthy.
    • Disneyland Paris. Landscape work for Disneyland Paris.
    • Heaton Park Regeneration Strategy. Regeneration strategy for Heaton Park, Manchester City Council, dated September 1996.
    • The Trafford Centre. Hard and soft landscape strategy masterplan for the shopping and leisure centre, dated August 1996.
  17. ContractUnited Kingdom

    ICI

    Darwen, Lancashire

    Engineering design department.

  18. My first role in the industryUnited Kingdom

    CAD Capture

    Blackburn, Lancashire

    Converting hand drawings to CAD.

The thread

The thread

2004 Belmont HillsBermuda 2006 VancouverCanada 2016 DartCayman Islands 2022 V&RBCanada Today

The Razor Method began with Belmont Hills in Bermuda, grew through every Vancouver role, and was thoroughly tested and evolved at Dart in the Cayman Islands. It is now the main vein running through all I do at V&RB.

Razor SHARP sets projects up. It does not rescue projects already too far gone.

Accountable and in control, before the project starts.

I guide public and institutional owners to set up and run projects so their estimates rest on reviewed, approved information, and problems surface early.

Decades guiding projects across four countries, from the owner, design and construction sides of the table. On Kapok, we put model-based coordination first: 2D exterior envelope details fell by more than 70%, site layout stayed within 1/16 inch, and there was no major redesign during construction.

ESTIMATE RANGE REVIEW AND APPROVAL GATES Number to your board ILLUSTRATIVE, NOT DATA

The problem I solve

BRIEFDESIGNTENDERCONSTRUCTION COST OF CHANGE Problems found on site Issues closed in design. Estimate stands up. ILLUSTRATIVE, NOT DATA

Throughout my career I've worked inside the teams that design and build, in the UK, Bermuda, Canada and the Cayman Islands. Overruns rarely start on site. They start months earlier, when the information reaching the owner and their consultants is incomplete, late, or hiding issues that only show up in construction.

The Razor Method, and what owners get from it, is set out on its own page. See how the Razor Method works

Kapok · Cayman Islands

I ran construction administration on Kapok personally. Because issues were closed out in design and shop drawing approval, there was no major redesign on site, and it was built as designed in almost every detail.

Rick Aspin

Belmont Hills · Bermuda

"Rick acted solely as both architectural and structural technologist on the project and because of his broad knowledge base, as well as his well-organized and professional work ethic, caused the design stage of the project to run smoothly with minimal staff resources."
Lead structural engineer on Belmont Hills, 2006. Original reference available on request.

Why owners trust me

Owner Design Construction

I've sat on an owner's side of the table. At Dart Enterprises I built the BIM/VDC department, managed the design process of multiple projects and was lead architectural designer for Kapok.

I've also worked inside architecture, design-build, structural, interiors and landscape teams, so I know where the handovers break.

Where to start

See where your next project is set up for success, and where friction is likely to start. The free Project Delivery Health Check takes a few minutes.

See the Health Check

Beyond the work

I love trail running, hiking, yoga and qigong. I've completed the Tour du Mont Blanc and the Inca Trail, and summited Mount Chachani (6,057 m) and Vinicunca, Rainbow Mountain (5,200 m). The Annapurna Trail is next.

Rick and his wife at the summit of Rainbow Mountain, Peru, with the striped mountain behind them.
Rick & his wife Simmi after reaching the summit of Rainbow Mountain.